GEORGETOWN, Guyana — Guyana and Suriname are seeking to convene a high-level bilateral meeting before the end of 2026 to resolve outstanding issues surrounding the proposed US$236 million Corentyne River Bridge.
President Dr. Mohamed Irfaan Ali said Friday that the meeting is expected to be hosted in Guyana, although the two governments have not yet agreed on a date.
The proposed 3.1-kilometre bridge would connect Moleson Creek in Guyana with South Drain in Suriname, creating a permanent road connection between the neighbouring countries.
The project has been under discussion for several years, with the two governments signing a memorandum of understanding in 2020 to advance planning.
However, disagreements over financing arrangements emerged earlier this year.
In July, Guyana’s Ministry of Foreign Affairs rejected suggestions that Suriname could independently determine the financing arrangements for the bridge.
The ministry maintained that the project had always been conceived as a joint undertaking requiring agreement on financing, construction, operation and management.
The dispute followed public statements by Surinamese officials suggesting that their government could assume responsibility for financing the crossing.
Guyana said no such proposal had been formally submitted through established bilateral mechanisms.
Ali subsequently reaffirmed that the bridge must remain a joint project.
Speaking Friday, the president said the proposed high-level meeting would address the outstanding challenges and opportunities.
He indicated that the government remains committed to advancing the project through dialogue and cooperation.
The bridge is expected to strengthen trade, tourism and transportation links between Guyana and Suriname while supporting wider regional economic integration.
